Thermal Power Plant
Application: FD Fan
1000 kW, 2300V, 4Pole, IC01
Mounting: IM B3
Starting Method: DOL
Efficiency: %95.2
Replacement GE
Thermal Power Plant
Application: FD Fan
1000 kW, 2300V, 4Pole, IC01
Mounting: IM B3
Starting Method: DOL
Efficiency: %95.2
Replacement GE
Case Study
Combined Cycle Power Plant
Application: CW Pump
650 kW, 6600V, 10Pole, TEAAC
Mounting: IM B3
Starting Method: DOL
Efficiency: %95.5
Replacement Siemens
Natural Gas Power Plant
Application: Pump
450 kW, 6600V, 50Hz, IP55, IC411
Mounting: B3
The power sector sets demanding targets for reducing the cost of energy production and strives to always increase its effeciency of the process, Teco Westinghouse with patented designs and innvoation has provided different solutions for FD and ID fans for speed control and specialist solutions to provide the best power factors on motors with lowest speed to match our clients expectations.